保温砂浆施工时应该注意这9个方面
来源:www.ynhhjc.com 发表时间:2018-07-02

1、保证表面无粉尘和无油污及影响粘结性能的杂物.

1, ensure that the surface without dust and oil pollution and affect the bonding properties of clutter.

2、热天或基层干燥即可基层吸水量大时应用水湿润,使基层达到内湿外干,表面无明水.

2, hot or dry can suction at the grass-roots level application in large amount of water wet, to grassroots dry, wet outside inside surface without MingShui.

3、保温系统专用界面剂按照水灰比1:4搅拌均匀,批刮于基层上,并拉成锯齿状,厚度约为3mm,或用喷涂方法也可.

3, heat preservation system special interface agent, in accordance with the water cement ratio 1:4 and scratch on the grassroots, and into a jagged, about 3 mm thickness, or by spraying method can also be used.

4、将无机保温砂浆按照水灰比1:1搅拌成浆体,应搅拌均匀,无粉团.

4, will be in accordance with the water cement ratio 1:1 mixing inorganic insulation mortar into slurry, should mix, glutinous rice dough.

5、将无机保温砂浆根据节能要求进行粉抹,2cm以上需分次施工,2遍抹灰间隔应在24小时以上,用喷涂方法也可以.

5, the inorganic thermal insulation mortar powder according to the needs of energy saving, more than 2 cm to divide second construction, 2 times plaster interval should be within 24 hours, by spraying method can also be.

6、将抗裂砂浆涂抹于保温砂浆上,厚度为2MM。

6, the anti-crack mortar from daub mortar, thickness of 2 mm.

7、在抗裂砂浆表面挂上抗碱网格布  

7, the anti-crack mortar surface put up resistance to alkali grid cloth

8、最后在抗碱网格布上再次涂抹2~3 MM厚度的抗裂砂浆  

8, the last on the resistance to alkali grid cloth again daub 2 ~ 3 MM thickness of anti-crack mortar

9、保护层施工完毕后,养护2-3天(视气温而异)即可进行后序饰面层施工.

9, protection layer after the construction, maintenance 2-3 days (depending on the temperature varies) after order act the role of surface can be achieved.